Solutions / Construction & plant
Construction & plant
Battery power that goes where the work is.
We've designed transportable battery systems for remote sites and sites with little or no grid capacity. They power cabins and tools, charge electric plant, then move with you to the next job. Less diesel, less noise, fewer emissions.

The challenge
Diesel costs
Generators run all day, often at low load.
Temporary sites
Projects need power before any grid connection exists.
Electric plant
Electric machinery needs charging where it works.
Noise and emissions
Planning conditions, neighbours and client ESG targets.
How GridUnlock solves it
One system, designed for your site, owned end to end
Every layer comes from GridUnlock, so the battery, chargers and software are designed together and one partner is accountable for the result.
Battery storage
Transportable battery
Designed for remote and low-capacity sites, moved on when the job is done.
Charging
DC and AC charging
For any electric plant, from excavators to concrete mixers.
Solar
Solar (optional)
Tops up the battery on longer projects.
Software
Vespr
Remote monitoring, so power is there when crews need it.
Capacity
More on the connection you have.
Cost
Lower peaks and bills.
Speed
Live in 6–8 weeks.
Future-proof
Modular, grows with you.

Case study
Concrete and quarry operators are leading the way
Front-line projects in the concrete and quarry sectors are electrifying plant with GridUnlock. Project reference to follow.
More case studies →Construction & plant FAQs
Can a battery fully replace our generator?
On many sites, yes, or it can run alongside a much smaller generator. We size it from your site's load profile.
How does it get to site?
We work with OEM transport partners to deliver and move systems between sites, so power arrives when the project starts.
Which electric plant can it charge?
Any, at DC or AC level. Concrete and quarry plant are the front-line examples today.
What does it look like on site?
A rugged, protective enclosure built for construction conditions, and it can be branded to your company or client.
How many generator hours could your next site save?
Run the Site Check with Construction pre-selected.