Skip to content

Solutions / Logistics & transport depots

Logistics & transport depots

Electrify the fleet without waiting years for a grid upgrade.

Battery-backed DC charging gives your depot the power to charge eHGVs and vans overnight and between shifts, on the connection you already have.

Find out how much capacity your depot really hasTalk to an engineer

Depot with eHGVs on charge

The challenge

Capacity wall

A handful of rapid chargers can max out a depot's supply.

Upgrade delays

New connections can take years and cost more than the chargers.

Tight schedules

Vehicles have to be charged and back on the road on time.

Fleet growth

Today's five trucks are next year's fifty.

How GridUnlock solves it

One system, designed for your site, owned end to end

Every layer comes from GridUnlock, so the battery, chargers and software are designed together and one partner is accountable for the result.

Capacity

More on the connection you have.

Cost

Lower peaks and bills.

Speed

Live in 6–8 weeks.

Future-proof

Modular, grows with you.

Case study

Explore Transport: electrifying depot operations

Explore Transport is electrifying its depot operations with GridUnlock: battery-backed DC charging for its eHGV fleet, designed, installed and managed end to end. Full case study coming soon.

More case studies →

Logistics & transport depots FAQs

Can we charge eHGVs on our current supply?

In many cases, yes. The battery stores energy when demand is low and releases it when trucks plug in, so peak charging power can be well above your connection. We confirm it from your half-hourly meter data at the site assessment.

Which trucks does it work with?

All of them. GridUnlock charging is compatible with every OEM's electric trucks and vans, with MCS-ready options for megawatt charging.

How long does installation take?

Typically 6–8 weeks from order to live charging, depending on site works.

Can we add chargers later?

Yes. The system is modular, so chargers and storage can be added without starting again.

How much capacity is your depot really missing?

Run the Site Check with Depots pre-selected and get a recommended setup in two minutes.

Run the Site CheckBook a site assessment

Book a site assessment