Design the energy system in from day one.

Plan your DC bus, storage, solar and charging alongside the building, and you can work with a smaller grid connection, cut running costs and scale without rework.

Run the Site CheckTalk to an engineer

New-build logistics warehouse

The challenge

Connection timelines

New connections may not match your build programme.

Over-sizing

Paying for capacity you only need at peak.

Future tenants

Unknown fleet and energy needs.

ESG requirements

Developers and occupiers expect low-carbon buildings.

How GridUnlock solves it

One system, designed for your site, owned end to end

Every layer comes from GridUnlock, so the battery, chargers and software are designed together and one partner is accountable for the result.

Capacity

More on the connection you have.

Cost

Lower peaks and bills.

Speed

Live in 6–8 weeks.

Future-proof

Modular, grows with you.

New build FAQs

When should we involve you?

As early as possible, ideally at design stage, so the electrical design and the connection application reflect the battery.

Can it reduce our grid connection size?

Often, yes, because the battery covers peaks. We confirm it for each site.

Do you work with developers and contractors?

Yes, as part of the design and build team.

Is it suitable for speculative builds?

Yes. The modular design scales to suit the eventual occupier.

Planning a new site?

Talk to an engineer at design stage and size the connection right first time.